S 182 119th Congress
Northwest Energy Security Act
A bill to provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.
Official Title as Introduced Congress.gov
Open official Congress.gov recordSource-linked procedural record
Bill journey
This is a chronology, not a progress score. Politically.com does not classify stages or infer what comes next. Records sharing a date are grouped because not every source field supplies a time.
-
Introduction Congress.gov
Introduced
Introduced in the Senate.
Open bill recordOfficial action Congress.gov
Read twice and referred to the Committee on Environment and Public Works.
Open bill recordOfficial action Congress.gov
Introduced in Senate
Open bill recordText version Congress.gov
Introduced in Senate
A dated text-version record is available.
Open text record
View the complete bill journey as an accessible table
| Date and time | Record | Official detail | Source |
|---|---|---|---|
| IntroductionIntroduced | Introduced in the Senate. | Congress.gov | |
| Official actionRead twice and referred to the Committee on Environment and Public Works. | No additional detail supplied.IntroReferral · Senate | Congress.gov | |
| Official actionIntroduced in Senate | No additional detail supplied.IntroReferral · Library of Congress · Code 10000 | Congress.gov | |
| Text versionIntroduced in Senate | A dated text-version record is available. | Congress.gov |
House roll calls join only on matching Congress, legislation type, and number. Senate roll calls join only on matching source-supplied document type and number, not question text. Committee and related-measure relationships have no date in their relationship records and therefore are counted above but never placed on the chronology.
Congressional Research Service
CRS summary
Northwest Energy Security ActThis bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho.Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin.The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary.Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.
Official documents
Text versions
- Introduced in SenateJan 22, 2025