S 465 119th Congress
GRID Power Act
A bill to require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.
Official Title as Introduced Congress.gov
Open official Congress.gov recordSource-linked procedural record
Bill journey
This is a chronology, not a progress score. Politically.com does not classify stages or infer what comes next. Records sharing a date are grouped because not every source field supplies a time.
-
Introduction Congress.gov
Introduced
Introduced in the Senate.
Open bill recordOfficial action Congress.gov
Read twice and referred to the Committee on Energy and Natural Resources.
Open bill recordOfficial action Congress.gov
Introduced in Senate
Open bill recordText version Congress.gov
Introduced in Senate
A dated text-version record is available.
Open text record -
Official action Congress.gov
Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.
Open bill record
View the complete bill journey as an accessible table
| Date and time | Record | Official detail | Source |
|---|---|---|---|
| IntroductionIntroduced | Introduced in the Senate. | Congress.gov | |
| Official actionRead twice and referred to the Committee on Energy and Natural Resources. | No additional detail supplied.IntroReferral · Senate | Congress.gov | |
| Official actionIntroduced in Senate | No additional detail supplied.IntroReferral · Library of Congress · Code 10000 | Congress.gov | |
| Text versionIntroduced in Senate | A dated text-version record is available. | Congress.gov | |
| Official actionCommittee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366. | No additional detail supplied.Committee · Senate | Congress.gov |
House roll calls join only on matching Congress, legislation type, and number. Senate roll calls join only on matching source-supplied document type and number, not question text. Committee and related-measure relationships have no date in their relationship records and therefore are counted above but never placed on the chronology.
Congressional Research Service
CRS summary
Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power ActThis bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects). Under the bill, dispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid.First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably. Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.
Official documents
Text versions
- Introduced in SenateFeb 6, 2025