S 465 119th Congress

GRID Power Act

A bill to require the Federal Energy Regulatory Commission to reform the interconnection queue process for the prioritization and approval of certain projects, and for other purposes.

Official Title as Introduced Congress.gov

Introduced Feb 6, 2025 Latest action Apr 15, 2026 Sponsor: Sen. Hoeven, John [R-ND] Energy
Open official Congress.gov record
Source: Congress.govUpdated 2026-08-03 11:15:40 UTC.

Source-linked procedural record

Bill journey

5 dated records

This is a chronology, not a progress score. Politically.com does not classify stages or infer what comes next. Records sharing a date are grouped because not every source field supplies a time.

Congress.gov Recently refreshed U.S. Senate XML Recently refreshed
Introduction 1 One supplied introduction date.
Official actions 3 3 dated action records.
Committees 1 1 undated relationship.
Amendments 0 No record is cached.
Text versions 1 1 dated, 0 without a supplied date.
House roll calls 0 No exact legislation-key match in the House-vote cache.
Senate roll calls 0 No exact document-key match in the Senate-vote cache.
Related measures 1 1 undated relationship.
Linked law 0 No linked law record is cached; this does not predict outcome.
  1. Official action Congress.gov

    Read twice and referred to the Committee on Energy and Natural Resources.

    IntroReferral · Senate

    Open bill record

    Official action Congress.gov

    Introduced in Senate

    IntroReferral · Library of Congress · Code 10000

    Open bill record

    Text version Congress.gov

    Introduced in Senate

    A dated text-version record is available.

    Open text record
  2. Official action Congress.gov

    Committee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366.

    Committee · Senate

    Open bill record
View the complete bill journey as an accessible table
Every dated cached record linked to S 465. Same-date row order does not assert procedural sequence.
Date and timeRecordOfficial detailSource
IntroductionIntroduced Introduced in the Senate. Congress.gov
Official actionRead twice and referred to the Committee on Energy and Natural Resources. No additional detail supplied.IntroReferral · Senate Congress.gov
Official actionIntroduced in Senate No additional detail supplied.IntroReferral · Library of Congress · Code 10000 Congress.gov
Text versionIntroduced in Senate A dated text-version record is available. Congress.gov
Official actionCommittee on Energy and Natural Resources Subcommittee on Energy. Hearings held. With printed Hearing: S.Hrg. 119-366. No additional detail supplied.Committee · Senate Congress.gov

House roll calls join only on matching Congress, legislation type, and number. Senate roll calls join only on matching source-supplied document type and number, not question text. Committee and related-measure relationships have no date in their relationship records and therefore are counted above but never placed on the chronology.

Congressional Research Service

CRS summary

Introduced in Senate Feb 6, 2025

Guaranteeing Reliability through the Interconnection of Dispatchable Power Act or the GRID Power ActThis bill requires the Federal Energy Regulatory Commission (FERC) to issue and periodically review a rule that revises the approval process for interconnection requests of generating units that produce electricity to prioritize dispatchable power projects (e.g., certain fossil fuel projects). Under the bill, dispatchable power generally refers to an electric energy generation resource, such as a generating unit that produces electricity from fossil fuels, capable of providing known and forecastable electric supply in time intervals necessary to ensure grid reliability. Currently, FERC receives interconnection requests from those projects and other generating units, such as units that produce electricity from renewable energy. Interconnection requests are requests from generating units to connect to the high voltage transmission lines of the electric grid.First, the rule must address the efficiency and effectiveness of the existing procedures for processing interconnection requests to ensure that new dispatchable power projects that improve grid reliability and resource adequacy can interconnect to the electric grid quickly, cost-effectively, and reliably. Second, the rule must revise the pro forma Large Generator Interconnection Procedures, and the pro forma Large Generator Interconnection Agreement as appropriate, to authorize transmission providers to submit proposals to FERC to prioritize new dispatchable power projects that will improve grid reliability and resource adequacy by assigning those projects higher positions in the interconnection queue of the provider. FERC must review and approve or deny such proposals within 60 days after the proposal is submitted.

Official documents

Text versions