Electricity: transmission planning and transmission facilities.

Source: Open States / PluralUpdated 2026-09-12 13:12:55 UTC.

Official record

Measure details

Jurisdiction
California
Session
20252026
Chamber
lower
Classification
bill
Subjects
Electricity, transmissionplanningandtransmissionfacilities
Introduced / first action
2026-02-18 00:00:00

Source-supplied abstracts

(1) Existing law requires the Public Utilities Commission (PUC) , in consultation with the State Energy Resources Conservation and Development Commission (Energy Commission) , to provide transmission-focused guidance to the Independent System Operator (ISO) about resource portfolios of expected future renewable energy resources and zero-carbon resources, including the allocation of those resources by region based on technical feasibility and commercial interest in each region to allow the ISO to identify and approve transmission facilities needed to interconnect resources and reliably serve the needs of load centers, as specified. On December 23, 2022, the PUC, the Energy Commission, and the ISO entered into a memorandum of understanding related to resource and transmission planning, transmission development and permitting, procurement, and interconnections to achieve reliability and policy needs and to coordinate the timely development of resources, resource interconnections, and needed transmission infrastructure. Existing law requires the Energy Commission and the PUC, in coordination with the ISO, every 5 years, to review the memorandum of understanding and a related workplan to ensure the memorandum and workplan reflect the coordination that is needed to help meet the state's energy goals. This bill would require those entities, on or before January 1, 2028, to update the memorandum and workplan to, among other things, ensure that the memorandum and workplan reflect the requirements of Federal Energy Regulatory Commission Order 1920, as applicable. (2) Existing law vests the PUC with regulatory authority over public utilities, including electrical corporations. Existing law requires the PUC to identify a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy and resource diversity in a cost-effective manner, as specified. This bill would require that the portfolio provide optimal integration in a cost-effective and risk-prudent manner, as specified. (3) Existing law requires that the above-described transmission-focused guidance provided to the ISO provide projections each year to support planning and approvals by the ISO in its annual transmission planning process, including projections of resource portfolios and electricity demand by region for at least 15 years into the future, as specified. Existing law expresses the state policy that planning for new transmission facilities include consideration of the goal of increasing systemwide reliability and cost efficiency, among other state policy goals. This bill would require that the transmission-focused guidance takes into account uncertainty and optionality, is risk prudent, and supports compliance with Federal Energy Regulatory Commission orders, as specified. The bill would remove the requirement that the projections be provided annually and would require the projections of resource portfolios and electricity demand by region to be for at least 20, rather than 15, years into the future. The bill would add to those state policy goals reducing resource interconnection timelines and supporting achievement of the state's energy, climate change, and air quality goals. (4) This bill would incorporate additional changes to Section 454.57 of the Public Utilities Code proposed by AB 2369 to be operative only if this bill and AB 2369 are enacted and this bill is enacted last. (5) Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime. Because certain provisions of this bill would be a part of the act and because a violation of a PUC action implementing its requirements would be a crime, the bill would impose a state-mandated local program by creating a new crime. The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement. This bill would provide that no reimbursement is required by this act for a specified reason.

Sponsors

Source-supplied history

Actions

  1. Enrolled and presented to the Governor at 4 p.m.

    executive-receipt
  2. Senate amendments concurred in. To Engrossing and Enrolling. (Ayes 79. Noes 0.).

    amendment-passage, committee-passage, committee-passage-favorable
  3. In Assembly. Concurrence in Senate amendments pending.

  4. Read third time. Passed. Ordered to the Assembly. (Ayes 39. Noes 0.).

    passage, reading-1, reading-3
  5. Read second time. Ordered to third reading.

    reading-1, reading-2, reading-3
  6. Read third time and amended. Ordered to second reading.

    amendment-passage, reading-1, reading-2, reading-3
  7. Read second time. Ordered to third reading.

    reading-1, reading-2, reading-3
  8. From committee: Do pass. (Ayes 7. Noes 0.) (August 13).

    committee-passage, committee-passage-favorable
  9. In committee: Referred to APPR. suspense file.

    referral-committee
  10. From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on APPR.

    amendment-introduction, amendment-passage, committee-passage, reading-1, reading-2, referral-committee
  11. In committee: Set, first hearing. Hearing canceled at the request of author.

  12. From committee: Do pass and re-refer to Com. on APPR. (Ayes 17. Noes 0.) (June 16). Re-referred to Com. on APPR.

    committee-passage, committee-passage-favorable, referral-committee
  13. From committee chair, with author's amendments: Amend, and re-refer to committee. Read second time, amended, and re-referred to Com. on E., U & C.

    amendment-introduction, amendment-passage, committee-passage, reading-1, reading-2, referral-committee
  14. Referred to Com. on E., U & C.

    referral-committee
  15. In Senate. Read first time. To Com. on RLS. for assignment.

    reading-1, referral-committee
  16. Read third time. Passed. Ordered to the Senate. (Ayes 71. Noes 0. Page 5221.)

    passage, reading-1, reading-3
  17. Read second time. Ordered to third reading.

    reading-1, reading-2, reading-3
  18. From committee: Do pass. (Ayes 11. Noes 0.) (May 14).

    committee-passage, committee-passage-favorable
  19. In committee: Set, first hearing. Referred to APPR. suspense file.

    referral-committee
  20. Re-referred to Com. on APPR.

    referral-committee
  21. Read second time and amended.

    amendment-passage, reading-1, reading-2
  22. From committee: Amend, and do pass as amended and re-refer to Com. on APPR. (Ayes 17. Noes 0.) (April 8).

    amendment-introduction, amendment-passage, committee-passage, referral-committee
  23. Re-referred to Com. on U. & E.

    referral-committee
  24. From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.

    amendment-introduction, amendment-passage, committee-passage, reading-1, reading-2, referral-committee
  25. Re-referred to Com. on U. & E.

    referral-committee
  26. From committee chair, with author's amendments: Amend, and re-refer to Com. on U. & E. Read second time and amended.

    amendment-introduction, amendment-passage, committee-passage, reading-1, reading-2, referral-committee
  27. Referred to Com. on U. & E.

    referral-committee
  28. From printer. May be heard in committee March 21.

  29. Read first time. To print.

    reading-1