Skip to content
Politically.com Search all
Menu

Delaware 153

SJR 3

DIRECTING ALL ELECTRIC PUBLIC UTILITIES IN DELAWARE TO PARTICIPATE IN A STUDY TO BE UNDERTAKEN BY THE DELAWARE SUSTAINABLE ENERGY UTILITY TO ASSESS AND ANALYZE THE COSTS AND BENEFITS OF THE ADOPTION OF ENERGY STORAGE SYSTEMS IN DELAWARE, AND DIRECTING THE DELAWARE SUSTAINABLE ENERGY UTILITY TO CONDUCT A PILOT PROGRAM WITH THE PARTICIPATION AND COOPERATION OF CERTAIN ELECTRIC UTILITIES TO DEVELOP AND DEPLOY PILOT PROJECTS INVOLVING BATTERY STORAGE SYSTEMS IN DELAWARE.

Source: Open States / PluralUpdated 2026-09-11 03:11:03 UTC.

Official record

Measure details

Jurisdiction
Delaware
Session
153
Chamber
upper
Classification
joint resolution
Subjects
Not supplied
Introduced / first action
2025-03-21 00:00:00

Alternate titles

  • DESEU/Direct/Study/Energy Storage Systems short title

Source-supplied abstracts

Energy Storage Systems provide benefits to the electric grid, including grid stabilization, managing peak energy demand, and providing backup power during outages. Energy Storage Systems can provide substantial cost savings to residential, commercial, and industrial electricity customers. The construction of Energy Storage Systems will promote economic growth and job creation in Delaware. This resolution directs the Delaware Sustainable Energy Utility (DESEU) to initiate and undertake a study to assess and analyze the costs and benefits of the adoption of Energy Storage Systems, both in front of and behind the meter, by all electric public utilities in Delaware. The resolution also directs the DESEU to conduct a pilot program and provide guidance and a level of funding, to be determined by the DESEU, to support Delmarva Power & Light Company, the Delaware Municipal Electric Corporation, the Delaware Electric Cooperative, and one independent power producer to deploy at least one battery storage pilot project in Delaware to serve their Delaware service territory. The DESEU is to submit a comprehensive report detailing the findings from the battery storage pilot program and the cost-benefit study and analysis of Energy Storage Systems in Delaware on or before June 1, 2026.

Sponsors

Source-supplied history

Actions

  1. Signed by Governor

    executive-signature
  2. Passed By House. Votes: 39 YES 1 ABSENT 1 VACANT

    passage
  3. Reported Out of Committee (Natural Resources & Energy) in House with 8 On Its Merits

    committee-passage
  4. Assigned to Natural Resources & Energy Committee in House

    introduction, referral-committee
  5. Passed By Senate. Votes: 18 YES 3 ABSENT

    passage
  6. Amendment SA 2 to SJR 3 - Passed By Senate. Votes: 18 YES 3 ABSENT

    amendment-passage
  7. Amendment SA 1 to SJR 3 - Stricken in Senate

  8. Amendment SA 2 to SJR 3 - Introduced and Placed With Bill

    amendment-introduction
  9. Amendment SA 1 to SJR 3 - Introduced and Placed With Bill

    amendment-introduction
  10. Reported Out of Committee (Environment, Energy & Transportation) in Senate with 1 Favorable, 6 On Its Merits

    committee-passage, committee-passage-favorable
  11. Introduced and Assigned to Environment, Energy & Transportation Committee in Senate

    introduction, referral-committee

When supplied by the API

Related measures

No resolvable related measure is supplied.