Final rule 2026-22677
Drawbridge Operation Regulation; Wishkah River, Aberdeen, WA
The Coast Guard is changing the operating schedule that governs the Puget Sound and Pacific railroad bridge (PS&P) across the Wishkah River, mile 0.1 in Aberdeen, WA. This rule will change the PS&P railroad bridge draw position to the fully closed-to-navigation position. Furthermore, this rule requires 24-hour notice for all drawbridge openings and a bridge operator will no longer be required to be on site.
Source-supplied record
Document details
- Document number
- 2026-22677
- Published
- Nov 6, 2026
- Effective
- Dec 7, 2026
- Comments close
- Not supplied
- Federal Register citation
- 91 FR 70011
Docket identifiers
- Docket No. USCG-2026-0562
CFR references
- Title 33, part 117